Outwood Grange Academy, Haydock

Gasmech led an extensive refurbishment programme at Outwood Grange Academy, revitalising the school’s building systems to meet modern educational standards and enhance energy efficiency.

Client

Company name Ltd

Project Value

£1.7M

Duration

38 Weeks

Sector

Education

Project Overview

The scope included replacing the central plantroom boiler and upgrading four satellite plantrooms, alongside comprehensive renewal of heating distribution pipework throughout the school.

Large-scale upgrades to lighting systems further improved energy performance and learning environment quality. Gasmech skillfully managed all associated builders’ work and making good, ensuring the smooth integration of new mechanical and electrical systems while minimizing disruption to the daily school activities. The project delivered a dependable, sustainable infrastructure designed to support educational excellence for years to come.

Challenges

Key Challenges & Delivery Approach

With over 1,000 students and staff on site, safeguarding occupant welfare was paramount; every phase was carefully sequenced to prioritize safety and continuous operation.
Working closely with AHR, we developed a rigorous phased implementation plan that upheld strict health and safety protocols while enabling efficient installation progress.
Consistent communication was maintained via daily briefings with school management, weekly coordination meetings with AHR and Energy Unique, and detailed monthly contractor reports shared with architects, M&E designers, cost consultants (RPP), and representatives from the Outwood Trust.
The removal and safe disposal of asbestos-containing pipework, dating back to the original 1932 installation, was managed with expert air quality monitoring and removal protocols to protect occupants.
The upgrade encompassed modernising legacy systems, including emergency lighting, comprehensive fire alarms, and a full overhaul of the Building Management System (BMS), delivering greater reliability and control.
Complex scheduling was required to work within tight decant spaces, ensuring classrooms and facilities met operational standards for uninterrupted student use shortly after completion.
A significant plant relocation was safely executed using twin cranes to remove a 15-metre, 10-ton chimney from the leisure centre car park, involving exclusion zones and thorough safety briefings to maintain a zero-incident record.

Outcome

Delivered on time and within budget, the project replaced outdated infrastructure with a modern, energy-efficient heating and electrical system aligned with the academy’s sustainability goals.

Gasmech utilised its off-site prefabrication capabilities within its workshop, accelerating the installation programme while significantly reducing workforce congestion on site.

Through proactive collaboration with the wider project team, additional enhancements were delivered, including a complete heating system upgrade and the refurbishment of the drama studio. This included new décor, suspended ceilings and bespoke lighting solutions, further enriching the student experience and improving the school’s facilities.

“Here we will have a great testimonial from the client that highlights key strengths.”

Jack Wood
Outwood Grange Acedemy

Need a Repair? Let’s Get It Sorted.

From minor scratches and dents to complete bodywork repairs, speak to the Spray Bay team for expert advice and a free, no-obligation quote.